TurningPoint Energy Reassures Ringgold With Solar Farm Plans

8/18/16

TurningPoint Energy and FLM Engineering hosted a second neighborhood meeting Wednesday evening at Dan River High School’s cafeteria to discuss the proposed solar farm at 2048 Kentuck Church Road.

TurningPoint Energy wants to purchase 76 acres at the intersection of Kentuck and Kentuck Church roads, where it would place approximately 1,300 solar panels. The land, which used to host a soybean farm, is located directly between Dan River elementary and high schools, and also connects to several pieces of private property. This location was chosen due to the availability of the land — and the proximity to a Danville Power & Light electric substation.

While the proposal was unanimously approved by Danville City Council and the Danville Utilities Commission, it still has to go through the permitting process in Pittsylvania County — and with the various state departments.

READ FULL ARTICLE HERE