FAA Gives Clearance For Wind Farm Atop Botetourt County Mountain

Wind turbines nearly as tall as the Washington Monument standing on top of North Mountain in Botetourt County will not pose a danger to passing aircraft, the Federal Aviation Administration has determined.

The finding, issued after nearly a year of study, is a key step forward for Apex Clean Energy, which plans to build what would be Virginia’s first commercial wind farm on the remote ridgeline.

At first, the FAA ruled in January that the 25 turbines — each one as tall as 549 feet — would be a hazard. But that was based on a standard rule that presumes any structure taller than 499 feet would interfere with air navigation.

READ FULL  ARTICLE HERE